Dissemination / reports

This deliverable summarizes the results of Task 1 5 Guidelines for the implementation of a continuous EPC workflow included in Work Package 1 WP1 of the TIMEPAC project The objective...

Guidelines for the implementation of a continuous EPC workflow

This deliverable summarizes the results of Task 1 5 Guidelines for the implementation of a continuous EPC workflow included in Work Package 1 WP1 of the TIMEPAC project The objective of WP1 is to conduct a comparative study of the elements involved in the development...
Deliverable 1.1
This deliverable summarizes the results of Task 1 1 EPC generation included in Work Package 1 WP1 of the TIMEPAC project The objective of WP1 is to carry out a...

Context analysis of EPC generation

Deliverable 1.1
This deliverable summarizes the results of Task 1 1 EPC generation included in Work Package 1 WP1 of the TIMEPAC project The objective of WP1 is to carry out a comparative study of the elements involved in the development of future scenarios to work with...
Deliverable 1.2
This deliverable summarizes the results obtained in Task 1 2 EPC data storage included in Work Package 1 WP1 of the TIMEPAC project The objective of WP1 is to carry...

Comprehensive analysis of data storage in the participating countries

Deliverable 1.2
This deliverable summarizes the results obtained in Task 1 2 EPC data storage included in Work Package 1 WP1 of the TIMEPAC project The objective of WP1 is to carry out a comparative study of the elements involved in the development of future scenarios to...
Deliverable 1.3
The present deliverable D1 3 relates to the work performed in Task 1 3 of TIMEPAC Task 1 3 is part of Work Package 1 WP1 which is aimed at...

Report on EPC data analysis

Deliverable 1.3
The present deliverable D1 3 relates to the work performed in Task 1 3 of TIMEPAC Task 1 3 is part of Work Package 1 WP1 which is aimed at carrying out a comparative study of the elements involved in the energy performance certification EPC...
Deliverable 1.4
This document contains the results of the work carried out in Task 1 4 Exploitation of EPC data of Work Package 1 Context Analysis to Support EPC Workflow of the...

Report of existing barriers to exploit EPCs and BIM

Deliverable 1.4
This document contains the results of the work carried out in Task 1 4 Exploitation of EPC data of Work Package 1 Context Analysis to Support EPC Workflow of the TIMEPAC project The objective of WP1 is to carry out a comparative study of the...
Deliverable 2.1
This report summarizes the work of Task 2 1 TDS 1 Generating enhanced EPCs with BIM data one of the five scenarios carried out in Work package 2 Transversal Deployment...

Generating enhanced EPCs with BIM data

Deliverable 2.1
This report summarizes the work of Task 2 1 TDS 1 Generating enhanced EPCs with BIM data one of the five scenarios carried out in Work package 2 Transversal Deployment Scenarios TDS This work package is concerned with the creation of future scenarios with the...
Deliverable 2.3
This report summarizes the work done in Task 2 3 TDS 3 Creating Building Renovation Passports from data repositories In a nutshell TIMEPAC supports the implementation of the Renovation Passport...

Creating building renovation passports from data repositories

Deliverable 2.3
This report summarizes the work done in Task 2 3 TDS 3 Creating Building Renovation Passports from data repositories In a nutshell TIMEPAC supports the implementation of the Renovation Passport by assessing renovation projects in the partner countries regarding procedures how to make use of...
Deliverable 2.2
This report summarizes to the work performed in Task 2 2 TDS 2 Enhancing EPC schemas through operational data integration of Work Package 2 Transversal Deployment Scenarios This work package...

Enhancing EPC schemas through operational data integration

Deliverable 2.2
This report summarizes to the work performed in Task 2 2 TDS 2 Enhancing EPC schemas through operational data integration of Work Package 2 Transversal Deployment Scenarios This work package is concerned with the creation of future scenarios with the aim of deploying and delivering...
Deliverable 2.4
Deliverable 2 4 Procedures and services for the integration of Smart Readiness Indicator SRI and environmental sustainability indicators in existing EPC tools relates to the work performed in Task 2...

Procedures and services for the integration of the SRI and environmental sustainability indicators in existing EPC tools

Deliverable 2.4
Deliverable 2 4 Procedures and services for the integration of Smart Readiness Indicator SRI and environmental sustainability indicators in existing EPC tools relates to the work performed in Task 2 4 of the TIMEPAC project Towards Innovative Methods for Energy Performance Assessment and Certification Task...
Deliverable 2.5
This report summarizes to the work performed in Task 2 5 TDS 5 Large scale statistical analysis of EPC databases of Work Package 2 Transversal Deployment Scenarios This work package...

Procedures and services to undertake large-scale statistical analysis of EPCs databases

Deliverable 2.5
This report summarizes to the work performed in Task 2 5 TDS 5 Large scale statistical analysis of EPC databases of Work Package 2 Transversal Deployment Scenarios This work package is concerned with the creation of future scenarios with the aim of deploying and delivering...
Deliverable 5.1
The Present D5 1 Communication and Dissemination Master Plan outlines the communication and dissemination activities planned by TIMEPAC partners for the whole project duration It describes the overall communication strategy...

Communication and Dissemination Plan

Deliverable 5.1
The Present D5 1 Communication and Dissemination Master Plan outlines the communication and dissemination activities planned by TIMEPAC partners for the whole project duration It describes the overall communication strategy of the consortium and functions as a guide for project partners when speaking about or...
Deliverable 5.2
This deliverable is a description of the TIMEPAC website and its different functionalities The pictures of the website included in this document refer to the state at M4 of the...

Project Website

Deliverable 5.2
This deliverable is a description of the TIMEPAC website and its different functionalities The pictures of the website included in this document refer to the state at M4 of the project The TIMEPAC website will be updated periodically in order to adhere to the overall...
Deliverable 5.6
This is a report of the TIMEPAC 21 workshop Dynamic EPC as enabler of Smart Energy Services Energy Efficiency Integration of RES in Buildings and Demand Response organized by the...

Proceedings of the TIMEPAC-21 workshop in Ljubljana

Deliverable 5.6
This is a report of the TIMEPAC 21 workshop Dynamic EPC as enabler of Smart Energy Services Energy Efficiency Integration of RES in Buildings and Demand Response organized by the Jožef Stefan Institute JSI that took place online on December 14th and 15th 2021 This...
Deliverable 5.7
This is a report of TIMEPAC 22 International Workshop Enhancing energy performance certification to drive the deep renovation of Europe s building stock organized by the Politecnico di Torino POLITO...

Proceedings of the TIMEPAC-22 International Workshop in Torino

Deliverable 5.7
This is a report of TIMEPAC 22 International Workshop Enhancing energy performance certification to drive the deep renovation of Europe s building stock organized by the Politecnico di Torino POLITO that took place on November 30th 2022 in Torino Italy This document contains the programme...
Deliverable 5.8
This is a report of the TIMEPAC 23 International Workshop Towards a dynamic and enhanced EPC advanced procedures for building assessment and certification organized by SERA global GmbH that took...

Proceedings of the TIMEPAC-23 International Workshop in Vienna

Deliverable 5.8
This is a report of the TIMEPAC 23 International Workshop Towards a dynamic and enhanced EPC advanced procedures for building assessment and certification organized by SERA global GmbH that took place on 21 November 2023 at the IG Architektur Gumpendorferstraße 63B Vienna Austria...
Deliverable 6.3
This document provides a detailed description of TIMEPAC s Data Management Plan DMP which covers the life cycle of the management of the data to be collected processed and generated...

Data Management Plan

Deliverable 6.3
This document provides a detailed description of TIMEPAC s Data Management Plan DMP which covers the life cycle of the management of the data to be collected processed and generated in the project The purpose of the procedures included in this plan is to make...
Deliverable 6.4
In this document the project activities which could raise some ethical issues are identified and the protocols which need to be followed to prevent them are described In particular activities...

Ethics Plan

Deliverable 6.4
In this document the project activities which could raise some ethical issues are identified and the protocols which need to be followed to prevent them are described In particular activities involving data protection such as obtaining information about users behaviour requiring the consent of users...